
Two high-voltage transmission lines restored in Kyiv after drone attack
Two main high-voltage transmission lines, damaged during the Russian night attack on 24-25 November, have already resumed operation without threat of power outages.
Two main high-voltage transmission lines, damaged during the Russian night attack on 24-25 November, have already resumed operation without threat of power outages.