
Shetland Islands connected to GB grid
For the first time, the Shetland Islands have been connected to the GB grid, thanks to the completion of two major projects.
For the first time, the Shetland Islands have been connected to the GB grid, thanks to the completion of two major projects.
Construction of the project began in the autumn of 2020, and the last turbine was installed August 2023.